Recent Projects

For ALL our project videos, check out our YouTube Page HERE! @TheLoizeauxGroupLLC

Project: Damaged Wind Turbine
Date: 05.22.2023
CLOSE

Damage by Thermal Event

Controlled Demolition, Inc., fells a new 117-meter tall wind turbine damaged by a thermal event on May 22, 2023.

Learn More About This Project

Project: BL England Generating Station- Hung Boilers
Date: 04.21.2023
CLOSE

Blast at Beesley's Point

Controlled Demolition, Inc., acting as Explosives Subcontractor to Main Demolition Contractor, Environmental Remediation Services, Inc., of Syracuse, New York, performs the preparation for and successful explosives felling of the boiler house consisting of three (3) hung boilers at the BL England Generating Station in Beesley's Point, New Jersey on Friday, April 21, 2023.

Learn More About This Project

Project: C.D. McIntosh Power Plant
Date: 01.14.2023
CLOSE

Phase I McIntosh Power Plant

Controlled Demolition, Inc., acting as Explosives Subcontractor to Total Wrecking and Environmental, LLC of Buffalo, New York, performs the planning for and explosives felling of the Unit #3 SCR and 252’ Chimney in Lakeland, Florida on January 14, 2023.

Learn More About This Project

Project: Deauville Beach Resort Hotel
Date: 11.13.2022
CLOSE

Hello, Goodbye

On Sunday, November 13, 2022, Controlled Demolition, Inc., acting as Explosives Subcontractor to Main Demolition Contractor, The BG Group, of Delray Beach, Florida, performed the preparation for and successful explosives felling of the Deauville Beach Resort Hotel.

Learn More About This Project

Project: Charles P. Crane Generating Station
Date: 08.19.2022
CLOSE

Fired-up with Coal Dust

Controlled Demolition, Inc. (CDI), acting as Explosives Subcontractor to Main Demolition Contractor, Control Services of Bayonne, New Jersey, performs the explosives felling of the Charles P. Crane Generating Station, located in Middle River, Maryland on August 19, 2022.

Learn More About This Project

Project: Berkman II Building
Date: 03.06.2022
CLOSE

Eyesore No More in Jacksonville

Controlled Demolition, Inc. (CDI), acting as Explosives Subcontractor to Main Demolition Contractor, Pece of Mind of Orlando, Florida, working under their contract with the City of Jacksonville, performs the preparation for and successful explosives felling of the long vacant, 18-story, reinforced concrete Berkman II building located in Jacksonville, Florida on Sunday, March 6, 2022.

Learn More About This Project

Project: 420 Main Street Building
Date: 11.21.2021
CLOSE

Former Old National Bank

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, Renascent, Inc. of Indianapolis, Indiana, performs the preparation for and explosives felling of one (1), 166,300 square foot, 19-story, reinforced concrete office building in Evansville, Indiana on Sunday, November 21, 2021

Learn More About This Project

Project: Power Plant Chimneys
Date: 11.13.2021
CLOSE

Phase II

CDI was the explosives subcontractor to the main demolition contractor, NorthStar Contracting Group, Inc. of Orlando, Florida.

Learn More About This Project

Project: Berkeley County Communications Tower
Date: 09.10.2021
CLOSE

480' Tall Communications Tower

CDI, acting as Explosives Contractor to the Owner, Berkeley County Water & Sanitation of Moncks Corner, South Carolina, performs the preparation for and successful explosives felling of one (1), 480’ tall, guyed communications tower in Berkeley County, South Carolina on Friday, September 10, 2021.

Learn More About This Project

Project: Plant Gorgas Hung Boilers
Date: 09.09.2021
CLOSE

A Fiery Finale

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, Jackson Demolition Service, Inc. of Schenectady, New York, performs the preparation for and successful explosives felling Units #8, #9 and #10 Hung Boilers, Unit #10 SCR, and the 270’ tall Vent Chimney located in Parrish, Alabama on September 9, 2021.

Learn More About This Project

Project: 21 Wind Turbines
Date: 08.31.2021
CLOSE

Turbines In The Lone Star State

In August of 2021, CDI felled twenty-one (21), 3 MW Wind Turbines that were being retired and decommissioned in west central Texas.

Learn More About This Project

Project: Sheraton Hotel at the Atlanta Hartsfield-Jackson International Airport
Date: 09.05.2021
CLOSE

A Coordinated Effort

CDI, acting as the Explosives Contractor to the Main Demolition Joint Venture of Renascent, Inc., of Indianapolis, Indiana and Corporate Environmental Risk Management, LLC (CERM) of Tucker, Georgia, performed the preparations for and successful explosives felling of the 12-story, post-tensioned, reinforced concrete tower portion of the former Sheraton Hotel at 7:30 AM on Sunday, September 5, 2021.

Learn More About This Project

Project: Roanoke Valley Energy Units 1 & 2
Date: 08.31.2021
CLOSE

Double Shot in Weldon

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, Genover, LLC. of Chappell Hill, Texas, performs the preparation for and successful explosives felling of one (1), 385’ tall Unit #1 reinforced concrete chimney and one (1), 380’ tall Unit #3 reinforced concrete chimney in Weldon, North Carolina on Tuesday, August 31, 2021.

Learn More About This Project

Project: Ferrybridge Power Station
Date: 08.23.2021
CLOSE

Industrial Blowdown

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, Keltbray, Ltd. of Esher, United Kingdom, performs the preparation for and successful explosives felling of one (1), 60,000 metric ton steel boiler house, bunker bay through the use of CDI’s linear shaped charge demolition methods and the felling of two (2), 650’ tall (198-meter) chimneys at the Ferrybridge Power Station in West Yorkshire, England on Monday, August 23, 2021. Drone footage courtesy of Arron Appleyard (Sky Captain Aerial and Media Productions) and additional footage provided by Keltbray, Ltd.

Learn More About This Project

Project: MOTBY Buildings #32 & #42
Date: 08.08.2021
CLOSE

A Tsunami of Concrete

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, Control Services, LLC of Jersey City, New Jersey, performs the preparation for and successful explosives felling of four (4), 6-story reinforced concrete buildings and two (2), 7-story buildings totaling 1,500,000 sq ft of structure in Bayonne, New Jersey on Sunday, August 8, 2021. A total of 7,184 holes were drilled and loaded by CDI with 6,400 lb of explosives and 10.2 miles of detonating cord in the non-electric initiation system to bring the structure down atop the 5’ high loading dock elevation of the 1st Floor slab. CDI’s explosives operations will facilitate the Main Contractor's fast-track removal of debris to support construction of a UPS terminal which will serve New York City and the other boroughs by ferry, rather than having their trucks suffer delays on bridges and in tunnels.

Learn More About This Project

Project: Carmichael Towers 1 & 2 Vanderbilt University
Date: 07.31.2021
CLOSE

Implosion in Music City

CDI, acting as Explosives Subcontractor to Main Environmental and Demolition Contractor, Demo Plus of Nashville, Tennessee and Katmai Government Services of Smyrna, Tennessee, successfully imploded the two (2), reinforced concrete dormitories in Nashville, Tennessee on Saturday, July 31, 2021, without damage to Bellevue while keeping the well-fragmented debris within the demolition site to facilitate it’s fast-track, post-implosion removal. Implosion dust was cleaned up within three (3) hours and the adjacent hotel and restaurants were able to open shortly thereafter.

Learn More About This Project

Project: Nucla Power Plant
Date: 07.23.2021
CLOSE

Another Coal-Fired Plant Gone

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, NorthStar Demolition and Remediation, Inc. of Denver, Colorado, performs the preparation for and successful explosives felling of the Unit #4 Boiler House and Steel Stack, located at the Nucla Power Plant in Naturita, Colorado on July 23, 2021.

Learn More About This Project

Project: Birchwood Power Plant Chimney
Date: 06.24.2021
CLOSE

Another Toppled Chimney

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, National Salvage & Service Corporation of Bloomington, Indiana) performs the preparation for and successful explosives felling of one (1), 399’ tall, reinforced concrete chimney located at the Birchwood Power Plant in King George, Virginia on June 24, 2021.

Learn More About This Project


Project: FPL Indiantown Plant Windscreen and Coal Conveyor System
Date: 06.16.2021
CLOSE

FPL's Last Coal-Fired Plant

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, D.H. Griffin Wrecking Co., Inc. of Greensboro, North Carolina, performs the preparation for and successful explosives felling of one (1), 495’ tall windscreen and one (1) coal conveyor system located at the Florida Power and Light Indiantown Plant in Indiantown, Florida on June 16, 2021.

Learn More About This Project

Project: Crystal River Energy Complex Hung Boiler Units #1 & #2
Date: 06.12.2021
CLOSE

Crystal River - Phase I

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, NorthStar Contracting Group, Inc. of Orlando, Florida, performs the preparation for and successful explosives felling of Hung Boiler Units #1 and #2 located at the Crystal River Energy Complex in Crystal River, Florida on June 12, 2021

Learn More About This Project


Project: 90 Mitsubishi 1000A Wind Turbines
Date: 05.01.2021
CLOSE

Explosive Felling in the High Desert

CDI, acting as Explosives Design and Performance Subcontractor to Main Demolition Contractor Dallas Demolition of Dallas, Texas, who was working for General Demolition Contractor RiverCap Ventures of Rocky River, Ohio, performs the successful explosives felling of 90, Mitsubishi 1000A Wind Turbines in New Mexico.

Learn More About This Project

Project: Global Agricultural Co. Production Unit
Date: 04.17.2021
CLOSE

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, American Integrated Services, Inc. of Anaheim, California, performs the preparation for and successful explosives felling of a Global Agricultural Company Production Unit, located in Houston, Texas at 8:00 AM on Saturday, April 17, 2021.

Learn More About This Project

Project: Plaza Tower
Date: 02.17.2021
CLOSE

A "Lay Down" in Atlantic City

Controlled Demolition, Inc., acting as Explosives Subcontractor to Main Demolition Contractor, Haines & Kibblehouse, Inc. of Philadelphia, Pennsylvania, performs the successful planning of, drilling for and explosives felling of the 34-story, reinforced concrete Plaza Tower in Atlantic City, New Jersey on Wednesday, February 17, 2021. The 34-story tower was 370' tall. CDI loaded 1,900 lbs of explosives in 2,300 locations over 14 floors of the structure and installed over 700 delays using a non-electric initiation system to carefully control the fall of the structure while maximizing debris fragmentation to facilitate removal of the tidy 70' tall pile of post-implosion debris.

Learn More About This Project

Project: Holiday Inn - Rosslyn
Date: 12.13.2020
CLOSE

Clearing the Way

CDI, acting as Explosives Subcontractor to Main Demolition Contractor, The Berg Corporation of Baltimore, Maryland, performs the preparation for and explosives felling of one (1), 20-story, post-tensioned, reinforced concrete hotel structure in Rosslyn, Virginia on Sunday, December 13, 2020.

Learn More About This Project