Ferrybridge Power Station

Controlled Demolition, Inc. (CDI), acting as Explosives Subcontractor to Main Demolition Contractor, Keltbray, Ltd. of Esher, United Kingdom, performs the preparation for and successful explosives felling of one (1), 60,000 metric ton steel boiler house, bunker bay through the use of CDI’s linear shaped charge demolition methods and the felling of two (2), 650’ tall (198-meter) chimneys at the Ferrybridge Power Station in West Yorkshire, England on Monday, August 23, 2021. Drone footage courtesy of Arron Appleyard (Sky Captain Aerial and Media Productions) and additional footage provided by Keltbray, Ltd.